Garfield Road West Extension – Marsden Park

Client: Stockland Location: Intersection of Garfield Rd and Richmond Rd, Marsden Park Duration: 24 weeks

Key Components

  • 60m of 610mm microtunneling under Richmond Rd
  • 975m of 375mm DICL, 350m of 450mm DICL,152m of 406m SCL & 645m of reticulation sized water main
  • 80m of 375mm reinforced concrete encasement through future roundabout.
  • 10 connections to existing Sydney Water network.
  • Detailed localised settlement monitoring activities associated with the microtunneling works under TfNSW asset.
  • Coordination with Western Earth Moving for construction milestones

Project Summary

Fluid Services has been engaged by Stockland for the construction of the trunk watermain at their new Elara residential precinct in Marsden Park. Works are being carried out along the new Garfield Road West extension in conjunction with road and stormwater construction by Western Earthmoving.

Project Details

Completion of the new trunk water main is key to completion of the road extension and registration of future developments.

Due to the tight corridor and proximity of surrounding residences, the project requires a high level of coordination with Western Earthmoving. As the water main extension will be constructed through a range of ground conditions, specific safety, community and environmental issues will be addressed by the team:

  • Noise, dust and environment management
  • Liaising with TfNSW, local residents, adjacent contractors
  • Excavation near existing creek lines
  • Installing and maintaining environmental controls throughout construction
Sydney Water Infrastructure Contractor, Fluid Services